top of page
woodwork_nb.jpg

Woodwork

Mission: Supply of 8,500 m² of flooring slabs
Equivalence: 680 tonnes of CO2 saved and 236 tonnes of waste avoided
Label: E+C-
Client: Woodeum
Architects: Nicolas Laisné and Dimitri Roussel
Delivery: 2021
Location :Saint-Denis (93200)

Références
Production
Kanal nb.jpg

Kanal

Mission: Supply of 16,500 m² of flooring slabs
Equivalence:1,320 tonnes of CO2 saved and 460 tonnes of waste avoided
Label: E+C- level E1C1
Client: Bouygues Bâtiment île-de-France private construction
Architects: Rudy Ricciotti
Delivery: 2021
Location: Pantin (93500)

PULSE.jpg

Pulse

Mission: Supply of 21,800 m² of flooring slabs and 220 ml of handrails

Client: ICADE

Delivery: 2018

Location: Saint-Denis

Program: Commercial

Phase: Execution

green oak détail nb.jpg

Green Oak

Mission: Supply of 7,850 m² of flooring slabs
Equivalence:628 tonnes of CO2 saved and 218 tonnes of waste avoided
Client: Kaufman Broad
Architects: MootzPelé et Calq
Delivery: 2021
Location: Arcueil
Program: Offices

EUREKA.jpg

Euréka

Mission: Supply of 5,300 m² of flooring slabs

Client: Bouygues construction

Delivery: 2019

Location: Paris

Program: Offices

Phase: Execution

av charles de gaulle_edited.jpg

Avenue Charles-de-Gaulle

Mission: Supply of 7,800 m² of flooring slabs

Equivalence: 134 tonnes of CO2 saved and 210 tonnes of waste avoided

Client: BNP Paribas

Architect: Arte Charpentier Architectes

Delivery: 2021

Location: Neuilly-sur-Seine

Program: Offices

macif_edited.jpg

Macif head office

Mission: Supply of 2,900 m² of flooring slabs

Equivalence: 58 tonnes of CO2 saved and 95 tonnes of waste avoided

Client: Frère SAS

Architect: J.M Dresse-Architecte D.P.LG

Delivery: 2021

Location: Niort

Program: Offices

ilot fertile eole evangile_edited.jpg

Ilot Fertile - Eole Evangile

Mission: Supply of 6,250 m² of flooring slabs

Equivalence: 125 tonnes of CO2 saved and 205 tonnes of waste avoided

Client: Linkcity France (supported)

Architect: TVK

Delivery: 2021

Location: Paris 19th arrondissement

Program: Housing, Shops and Offices

image_2021-10-13_121308_edited.jpg

Safran Malakoff

Mission: Supply of 6,105 m² of flooring slabs

Equivalence: 120 tonnes of CO2 saved and 170 tonnes of waste avoided

Client: Safran

Architect: STUDIOS architecture Paris

Delivery: 2021

Location: Malakoff

Program: Offices

morland_edited.jpg

Morland

Mission: Supply of 2,900 m² of flooring slabs

Equivalence: 87 tonnes of CO2 saved and 96 tonnes of waste avoided

Client: Bouygues Bâtiment Ile-de-France

Architect: David Chipperfield Architects + CALQ Architecture

Location: Paris 4th arrondissement

Program: Housing, Shops, Cultural spaces

Innolin nb.jpg

Innolin

Mission: Supply of 2,800 m² of flooring slabs

Equivalence: equivalent of 84 tonnes of CO2 saved and 84 tonnes of waste avoided

Client: SPIE Batignolles

Architect: TVK

Location: Mérignac

Program: Offices

aphp paris 12 nb.jpg

AP-HP

Mission: Supply of 7,500 m² of flooring slabs

Equivalence: equivalent of 225 tonnes of CO2 saved and 225 tonnes of waste avoided

Client: Campenon Bernard Construction

Architect: Chartier-Dalix

Location: Paris 12th arrondissement

Program: Hospital

Biome nb.jpg

Biome

Mission: Supply of 9,000 m² of flooring slabs

Equivalence: 270 tonnes of CO2 saved and 270 tonnes of waste avoided

Client: Bouygues Bâtiment IDF

Architect: YMA, Jouin Manku

Location: Paris 15th arrondissement

Program: Offices

With the support of:

©2025 - MOBIUS BENELUX

Logo-Be-Circular.png
SE-logo-rvb-fr.png
bottom of page